UC San Diego, Triton Center
Project Summary Location: La Jolla, CA (UC San Diego campus) Dates of Service: 2022 - Current Services Performed: Whole-Building Commissioning, Title-24 Acceptance Testing, LEED Fundamental and Enhanced Commissioning, Monitoring-Based Commissioning (MBCx) Number of Buildings: 4 Square Feet: ~340,000 GSF across four buildings (Building A 141,259 GSF, Building B 81,550 GSF, Building C 58,232 GSF, Building D 59,232 GSF), plus approximately 190,000 GSF of below- and above-gra
Alex Mathers
Nov 55 min read


Project Feature: UC Riverside, Undergraduate Teaching and Learning Facility
Project Summary Location: Riverside, CA (UC Riverside campus) Dates of Service: 2024 - Current Services Performed: Whole-Building Commissioning, Title-24 Acceptance Testing, LEED Fundamental and Enhanced Commissioning, Monitoring-Based Commissioning (MBCx) Number of Buildings: 1 Square Feet: ~120,000 GSF, including approximately 100,700 SF of academic space, four floors Systems Commissioned: MEP Systems, Lab Air Handling Units, Laboratory Exhaust and Fume Hoods, Domestic
Alex Mathers
Oct 25 min read


Best Practice for Design and Submittal Reviews
Alex Mathers, P.E., CxA, NEBB CP Alex@GMCCx.com Design and submittal reviews should not be optional on most commercial projects. Having an independent third party check the design and the equipment submittals for operability and testability is best practice. The best opportunity to get it right is while the mistakes are on paper instead of in the field. California's energy code makes the design and submittal review a requirement. Under Title 24, Part 6, Section 120.8, new n
Alex Mathers
Aug 257 min read


Project Feature: McGrath Outpatient Pavilion at UC San Diego Health
Project Summary Location: San Diego, CA (Hillcrest Medical Campus) Dates of Service: 2021 - Current Services Performed: LEED for Healthcare Cx, Title-24 Commissioning, OSHPD/HCAi Cx, Monitoring-Based Commissioning (MBCx) Number of Buildings: 1 (Phase 1 of the Hillcrest Medical Campus Redevelopment) Square Feet: ~250,000 SF, six floors Systems Commissioned: MEP Systems, Central Utility Plant, Low Voltage, BMS, Imaging and Radiation Therapy Support Systems Space Types: Ambulato
Alex Mathers
Jun 243 min read


When "Done" Doesn't Mean Ready: The Real Work of Commissioning
Alex Mathers P.E., CxA, NEBB CP Alex@GMCCx.com Most people think commissioning is about testing systems. After 20 years in the field, I can tell you it's mostly about something else entirely. It's about working between contractors, vendors, and customers to make sure what's "done" is actually complete and ready to be tested. That gap between "done" and "ready" is where commissioning lives or dies. The Project Schedule Game Every project I've worked on has a schedul
Alex Mathers
Jun 114 min read


Project Feature: Neurocrine Aperture Qualification
Project Summary Location: San Diego, CA Dates of Service: 2025-2026 Services Performed: Critical GMP Utilities Qualification, Temperature Mapping, URS Development, SOP Development Number of Buildings: 2 Systems Qualified: RO/DI water, nitrogen gas, vacuum, clean compressed air, temperature-controlled units (refrigerators and freezers), HVAC, and ultra-purified water system Project Background Neurocrine Biosciences, Inc. (NBI) is dedicated to discovering and developing life-
Teresa Schneider
May 82 min read


Temperature Mapping: Protecting What Matters Most in GxP Cold Storage
Teresa Schneider, P.E., CxA, LEED GA, BECxP Teresas@gmccx.com A pharmaceutical company’s most critical assets often aren’t their equipment or their real estate. It's the temperature-sensitive materials stored inside their cold units. One excursion event, one undetected hot spot, one door seal that doesn’t seat properly, and product integrity is compromised, resulting in significant loss of revenue. The stakes are high, and the margin for error is essentially zero. Temperature
Teresa Schneider
Apr 66 min read


Automated Tenant Billing: The Future of Multi-Tenant Building Management
Matt Marion, P.E., CEM Mattm@gmccx.com The era of manual meter reads and pro rata guesswork is ending. The era of intelligent, automated, fair utility billing has arrived. In multi-tenant commercial buildings, utility billing has long been a manual, time-consuming process fraught with inefficiencies and inequities. Traditional pro rata billing methods based solely on square footage fail to incentivize energy conservation and often penalize efficient tenants while subsidizin
Matt Marion
Feb 257 min read


Commissioning with Load Banks – False Load, Real Results
Alex Mathers P.E., CxA, NEBB CP Alex@GMCCx.com One major challenge of commissioning is proving system performance before full operations start. In an ideal world, building systems would always be commissioned under full, real operating load. In reality, during functional testing the building systems may be “ready for testing,” but with no loads. That is, no tenants, no occupants, no servers, or switches, no process equipment. Still, most owners want documented performan
Alex Mathers
Jan 2010 min read