Within Tolerance - Reviewing the TAB Report
A TAB report can pass at every fan and box while rooms still miss their design airflow. How commissioning reviews a TAB report to catch what the totals hide.
Alex Mathers
2 days ago11 min read


Best Practice for Design and Submittal Reviews
Why independent design and submittal reviews are best practice, and how Title 24 makes them a requirement for new nonresidential buildings in California.
Alex Mathers
Aug 257 min read


When "Done" Doesn't Mean Ready: The Real Work of Commissioning
Commissioning is less about testing than closing the gap between "done" and truly ready to test. Lessons from 20 years of working between contractors and owners.
Alex Mathers
Jun 114 min read


Commissioning with Load Banks – False Load, Real Results
How load banks let commissioning prove system performance under full load before tenants, servers or process equipment arrive.
Alex Mathers
Jan 2010 min read


GMC Cx Transfer Timer™
GMC Cx Transfer Timer™ GMC Cx is always innovating and finding superior ways to verify and document construction quality. We believe in using the right tool for the right job which is why we leverage custom built Skyspark Analytics for Monitoring Based Commissioning and Facility Grid as a cloud-based commissioning platform. Our innovation continues with our recently developed Transfer Timer™. This portable device provides precise, real-time and recorded data on the power t
Alex Mathers
Feb 20, 202510 min read


Top 10 Commissioning Issues Found
The Top Ten List was a regular segment of the Late Show with David Letterman and were a comedic institution, renowned for their wit, irreverence, and satirical take on current events, pop culture, and everyday life. I remember staying up late to watch Letterman and enjoying the rapid-fire succession of humorous observations and visual gags. Whether lampooning political figures, dissecting societal trends, or poking fun at mundane topics, the Top Ten Lists showcased Letterman'
Alex Mathers
May 17, 20246 min read


What Most People Don't Understand about Integrated System Testing
Integrated System Testing stands as an indispensable component in the commissioning process for buildings and facilities. By rigorously testing and validating the interoperability, performance, and compliance of integrated systems, IST ensures that commissioned facilities not only meet but exceed the expectations of owners, occupants, and regulatory authorities. As the construction and facility management landscape evolves, IST remains a cornerstone in achieving excellence in
Alex Mathers
Mar 4, 20246 min read


Challenges with Commissioning Package Units (RTUs)
A Package Air Handler Unit or “Package Unit” or “Rooftop Unit (RTU)” for short is a self-contained HVAC system. It is called a “packaged unit” because it includes all the components required for heating, ventilating and air conditioning: · Evaporator coil · Condenser coil · Compressor · Gas Heat (if not a heat pump) · A Fan (Blower) · An intake for outside air Compared to a traditional split system which has an indoor section connec
Alex Mathers
Dec 14, 20235 min read


Start up and Commissioning: What's the Difference?
In the world of complex projects commissioning plays a vital role in ensuring that equipment, a system, facility, or process is fully prepared to function efficiently and effectively before final verification. Whether it's a new manufacturing plant, laboratory, data center, hospital or office, the operational readiness that commissioning provides is the steps that bridges the gap between construction and turnover. What is Operational Readiness? Operational readiness means dif
Alex Mathers
Sep 19, 20233 min read


Demand Control Ventilation – Multizone Issues and Sequence Gaps
You know the old saying “Build tight, ventilate right…and always hire a commissioning agent by DD at the latest!” Proper ventilation (in conjunction with proper exhaust) is critical to creating a safe and comfortable indoor environment. While in theory, demand control ventilation (DCV) provides an economical means of providing outdoor air to occupied spaces at the rates required by local building codes, in practice, there are difficulties which prevent DCV implementation as
Alex Mathers
Dec 16, 20227 min read


If It Wasn’t Documented, It Wasn’t Done
The “not documented, not done” motto is a common one many professional settings, particularly as it applies to construction documentation. Consistent and complete documentation for every project is an essential component of providing quality assurance. Clear documentation clarifies expectations, establishes official agreements, records building elements, protects all parties involved in the building process, and most importantly, ensures the client is satisfied with the final
Alex Mathers
Sep 22, 20222 min read


Do You Dalt? You Should.
Air distribution systems use a significant amount of energy. According to the United States Department of Energy (DOE), air distribution systems in commercial buildings use roughly 1.5 quadrillion BTUs of energy, or roughly 1.5 percent of energy nation-wide. Unfortunately, some of this energy is unnecessarily wasted. According to ASHRAE, almost all buildings have significant duct leakage. Duct leakage is when distributed conditioned air leaks through joints, seams, and penet
Alex Mathers
Sep 2, 20225 min read


Electrical System Commissioning - Don’t You (Forget About Me)
As you walk on by, Will you call my name? Or will you walk away… Breakfast Club soundtrack references aside, electrical system commissioning commonly takes a backseat to mechanical system commissioning in many non-data center projects. If you’re a facility manager, operations manager, or owner with responsibility for the successful operation of your facility, as much as you want reliability from HVAC or process systems, you’ll want it even more from your facility’s electrical
Alex Mathers
Jul 19, 20227 min read


Commissioning Core and Shell Projects – Challenges and Solutions
New, ground up developer led projects are typically built as two distinct and separate projects. There is “Core and Shell” or Base Building Projects where the basic inside (Core) and the outer building envelope (Shell) are constructed and there are “Tenant Improvement” projects (T.I.) where the interior spaces are custom built to tenant requirements. The Core and Shell The Shell is the exterior elements which cover the core of commercial buildings and properties. The Shell of
Alex Mathers
May 19, 20226 min read


Supply Air Temperature Trouble
Image: Typical SAT Sensor The supply air temperature sensor is required for all ducted heating applications in California and recommended by ASHRAE. By the nature of zoning, temperature and airflow are constantly adjusted throughout the day. Room temperature is controlled by modulating the air volume damper and the reheat valve in sequence. When in heating mode operation, the supply air temperature is maintained at set point by sequencing the heating hot water valve controlli
Alex Mathers
Feb 10, 20227 min read


Hire a CxA by Starting at the End – The Commissioning RFP
A great construction project starts with a complete and well written Request for Proposal (RFP). Every time I see construction projects go south, the cause can typically be traced back to an RFP which was assembled in haste, did not include sufficient information, and did not define the owner’s expectations. An RFP is a document that solicits a bid and proposal from prospective consultants or contractors. The RFP defines the bidding requirements and describes the project s
-
Aug 28, 20203 min read


“What if…” – 5 Ways to Enhance your Data Center Commissioning Process
When it comes to commissioning data centers, no stone can be left unturned. A thorough commissioning process is essential to system uptime and maintaining business continuity. Verifying resilience and performance of MEP systems has its challenges, requiring systematic planning and testing. The game of "What if..." has potential to start important discussions throughout the project, and if asked at the right time, provide huge value. Here are five (5) ways to enhance the d
Michael Conway
Aug 7, 20195 min read


4 Quick Steps to Save Your Motors
The two most common motor types in HVAC and plumbing applications are Open Drip Proof and Totally Enclosed Fan Cooled motors. ODP motors are typically smaller and less expensive and therefore used more frequently in indoor applications, however, even indoors the ODP motor is susceptible to corrosion and early failure. A rule of thumb that needs updating is OPD motors are ok for all indoor applications. In closed coupled and vertical-inline CHW pumping applications the ODP
-
Feb 28, 20181 min read


Cx Issues Log - Is bigger really better?
There is a common misconception in the commissioning industry; the more commissioning issues on the log, the better the commissioning agent (CxA). Do the number of construction related commissioning issues truly quantify the quality of the CxA? I don't think so. Early in my career, before moving to the into commissioning, I programmed control systems for a design-build mechanical contractor. During those 8 years, I worked on numerous projects, from small to large, simple
Michael Conway
Oct 13, 20173 min read