top of page

BMS Sierra

BRISTOL MYERS SQUIBB - SIERRA

SAN DIEGO, CA


Value Provided

GMC Commissioning's technical value was brought to the project through in-depth expertise.  Our ability to communicate effectively, appropriately address relevant issues, and provide creative troubleshooting suggestions allowed the project to stay on budget and schedule.

Project Overview

This project is a large tenant improvement buildout of roughly 420,000 SF that will consolidate many of the BMS San Diego science business units into a single building. 

 

GMC Cx provided whole-building, technical commissioning services for the new 7 level, 420,000 SF, $330+ million building including all MEP and building automation system components. GMC Cx was brought on early for a design assist role and worked with the teams on design phase reviews, acceptance criteria and owner requirements. GMC Cx Provided a custom-built fault detection and performance analytics system using Skyspark. 

 

Included in the scope was monitoring of Central Utility Plant provided under the core and shell scope with SkySpark.

 

Systems Commissioned

  • Mechanical Systems including AHU, CRAC, and CAVs​

  • Electrical, Emergency Power, Lighting Controls

  • Plumbing Systems including Compressed Dry Air, RODI, Domestic Hot and Cold Water

  • Lab Exhaust

  • Fume Hoods and Specialty Equipment

  • Solvent Delivery and Waste

  • Cold Rooms, Freezer Rooms, Vivarium

  • Sound Level and Vibration Testing

  • Safety, Gas Detection, Fire Protection and Suppression

  • Security System and AV Cabling

  • Landscape Irrigation Controls

  • Building Automation System