Illumina Central Plant

Illumina Headquarters Campus CHW PLant

san diego, ca

Value Provided

GMC Commissioning's expertise in complex and integrated central plant systems as well as an acute focus on mission-critical, business continuity provided the owner with the assurance of maintaining operations during the complex testing process.  GMC Cx drove collaboration with the team by pulling together facilities operations, controls and contractors to ensure a joint effort.

Project Overview

Retrofit and addition of an 800 ton water-cooled chiller to an existing 4000 ton plant serving a multi-building campus with lab and live manufacturing space.  Project includes the addition of a chiller, cooling tower, chilled water and condenser water pumps to variable primary and implementation of Siemens Demand Flow control for Central Plant Optimization. GMC Cx provided full Calibrated Commissioning services including a feasibility study, OPR, BOD, RFP and design phase and construction phase commissioning.

Systems Commissioned

  • Mechanical

    • (6) 800 Ton Water-cooled Chillers

    • (5) Open Loop Cooling Towers

    • (14) CHW and CW Pumps

    • VFDs

  • Building Automation System including Central Plant Optimization

  • Refrigerant Detection and Ventilation System