Central Plant Projects
AT&T Madison Central PLant
Los Angeles, ca
Project Overview
GMC Commissioning’s team provided commissioning services for a 4000-ton Chilled Water Plant retrofit project at AT&T’s Madison Complex in Los Angeles, CA. This project included replacement of chillers, cooling towers, pumps and controls. The chilled water system provides cooling to ~1M SF of data center and support spaces.
Systems Commissioned
-
Mechanical
-
(4) 1000 Ton Water-cooled Chillers
-
(6) Open Circuit Cooling Towers
-
(14) Primary, Secondary, and Tertiary Pumps
-
-
Building Automation System
-
Chiller Optimization Package and Energy Dashboard
Sharp Memorial CHW PLant REtrofit
san diego, ca
Project Overview
GMC Commissioning’s team provided commissioning services for a 4000-ton Chilled Water Plant retrofit project at Sharp Memorial Hospital in San Diego, CA. This project included replacement of chillers, heat exchangers, tertiary pumps, and controls. The chilled water system provides cooling to nearly 1M SF of critical care hospital and support spaces.
Systems Commissioned
-
Mechanical
-
(4) 1000 Ton Water-cooled Chillers
-
(1) 1000 Ton Backup Absorption Chiller
-
(12) Open Circuit Cooling Towers
-
Primary, Secondary, and Tertiary Pumping
-
-
Building Automation System
Pacira Pharmaceutical CHW PLant
san Diego, ca
Project Overview
Retrofit of 600 ton water-cooled chiller plant serving live manufacturing space. Project includes replacement of (3) chillers, (3) cooling towers, conversion chilled water pumps to variable primary and implementation of Siemens Demand Flow control for Central Plant Optimization. GMC Cx provided design phase and construction phase commissioning.
Systems Commissioned
-
Mechanical
-
(3) 200Ton Water-cooled Chillers
-
(3) Open Loop Cooling Towers
-
(6) CHW and CW Pumps
-
(1) Process Heat Exchanger
-
-
Building Automation System including Central Plant Optimization
-
Refrigerant Detection and Ventilation System
Illumina Headquarters Campus CHW PLant
san Diego, ca
Project Overview
Retrofit and addition of an 800 ton water-cooled chiller to an existing 4000 ton plant serving a multi-building campus with lab and live manufacturing space. Project includes the addition of a chiller, cooling tower, chilled water and condenser water pumps to variable primary and implementation of Siemens Demand Flow control for Central Plant Optimization. GMC Cx provided full Calibrated Commissioning services including a feasibility study, OPR, BOD, RFP and design phase and construction phase commissioning.
Systems Commissioned
-
Mechanical
-
(6) 800 Ton Water-cooled Chillers
-
(5) Open Loop Cooling Towers
-
(14) CHW and CW Pumps
-
VFDs
-
-
Building Automation System including Central Plant Optimization
-
Refrigerant Detection and Ventilation System