data center uptime is up to us

Nearly 70 percent of early equipment failures can be traced to design, installation, or startup deficiencies. Unnecessary and unplanned outages are often due to improper coordination and calibration of protective devices, wiring errors, design errors, and human error. Commissioning detects and corrects these problems before the failures or outages occur. 

Uptime of mission critical data centers is essential to business continuity.  Commissioning plays a key role is ensuring systems are designed, installed, operated, and maintained in accordance with the Owners Expectations.  Our team has extensive experience designing, commissioning, and operating mission critical spaces.  We bring owner, contractor, and consulting engineering experience together to provide a robust commissioning team for your projects.

CAPABILITIES

  • Owner Project Requirements (OPR)

  • MEP Peer Reviews and Risk Assessments

  • Controls System Design-Assist focused on Fail-safe design and programming.

  • Data Center Energy Management

  • Factory Acceptance Testing (FAT)

  • Site Acceptance Testing (SAT)

  • Cx Protocol Development and Execution

  • Integrated System Testing

  • Load Bank Planning

  • IR Scanning

  • Turnover Package Management

LEVELS OF MISSION CRITICAL COMMISSIONING

  • Level One Commissioning – Factory Witness Testing

  • Level Two Commissioning – Site Acceptance Inspection

  • Level Three Commissioning – Pre Functional Testing & Start Up

  • Level Four Commissioning – Functional Performance Testing

  • Level Five Commissioning – Integrated Systems Testing

SYSTEMS WE COMMISSION

  • Mechanical

  • Electrical (Distribution, Emergency & Standby Power, UPS)

  • Plumbing

  • Low Voltage

  • Fire Alarm, Fire Suppression, Early Warning Smoke Detection 